By engineering calculations made by suitable blasting, selecting the pattern to the desired size distribution can be achieved in material and ideal material.
Selecting the correct machine size can be affected by weather conditions than the planned production.
Ore grabs are equipped with extra sheaves to ensure a good penetration and high closing force.